Construction on the bridge began in spring 2007 with the
steel being manufactured in an Italian steel factory often used by Calatrava to
manufacture his designs. The factory made the steel for his Athens stadium. It
connects Spur 366 in downtown to Singleton Boulevard in west Dallas. The
cable-stayed bridge was expected to cost $93 million, its total length is 1,870
feet with a main-span of 1,197 feet, and an apex-height of 400 feet
Oswald Rooming House Tour © 1206 N Beckley Blvd, Dallas Texas (214)-310-0700
Oswald Rooming House Tour © 1206 N Beckley Blvd, Dallas Texas (214)-310-0700
No comments:
Post a Comment